Ping An Finance Centre
The Ping An Finance Centre was completed in March 2017, becoming the fourth tallest building in the world.
Measuring 599 m (1,965 ft), with 115-storeys, the tower is the tallest in Shenszhen and the second tallest in China. It was built to serve as the headquarters of Ping An Insurance.
Designed by Kohn Pedersen Fox Associates the tower contains state-of-the-art office space above an 11-storey, publically-accessible podium with a multi-storey atrium. The top two storeys contain an observation deck.
Described as having the form of a ‘taught steel cable’, the top of the tower tapers to a prism. Eight composite mega-columns further emphasise the building’s form, anchored to the composite concrete core using steel outriggers. These mega-columns help streamline the structure by extruding beyond the envelope, improving both structural and wind performance. Baseline wind loads are estimated to be reduced by 35% as a result of this design solution.
The tower’s stainless steel façade is the largest in the world to-date, consisting of 1,700 tons of 316L steel, chosen for its corrosion-resistant properties. This is intended to maintain the Centre’s external appearance despite the high salt content of Shenzhen’s coastal atmosphere.
Construction work began in August 2009 and was topped out in April 2015. The original design included a 60 m antenna which would have taken the total height of the building to more than the Shanghai Tower, making it the second tallest in the world. However, in February 2015 this was dropped from the design due to the possible obstruction of flight paths.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.